Ward 7 · Pune Municipal Corporation

Yerwada – Kalyani Nagar East

Corporator: TBD — Contact Sushaasan · Annual budget ₹2.6 Cr

Solution cost vs annual allocation₹7.3 L / ₹2.6 Cr(3%)

Resolving every active brief uses 3% of the ward's annual budget.

👥For Citizens

What's happening in this ward

3 issues reported this week
Traffic2 reports
5/5

1 reports via instagram about traffic issues in this area (last 24h). Avg severity 5.0/5.

Water15 reports
3/5

Yerwada inner lanes around Bharat-Petrol pump report supply gaps post 6pm; tankers being called daily.

Garbage8 reports
3/5

Yerwada community-bin overflow at three points — RWAs request twice-daily lift schedule.

📋For the Corporator's Office
AI-synthesised brief

Ready-to-act solution plan

Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.

Garbage✓ Within budget

8 reports this week across 7 locations in Yerwada indicate chronic community-bin overflow, with an average severity of 2.9/5 and RWA demand for twice-daily collection. The current single-lift schedule is insufficient to handle waste volumes at these three overflow-prone points.

72
Priority
₹1.2 L estimate21 days5 steps
What government can do
  1. 1

    Conduct a site inspection at all 7 cited locations to document bin capacity, current fill rates, and overflow frequency; compile a photographic and written report to formally justify schedule revision

    PMC Solid Waste Management Department3d₹5K
  2. 2

    Submit a formal written request to the PMC Solid Waste Management Department zone officer to revise the collection schedule for the three overflow points in Yerwada to twice-daily lifts (morning and evening), attaching the inspection report as supporting evidence

    PMC Solid Waste Management Department5d₹0
  3. 3

    Coordinate with the contracted garbage collection vehicle operator to deploy an additional evening round specifically covering the three identified overflow points, confirming vehicle availability and driver assignments in writing

    PMC Solid Waste Management Department – Contracts & Operations7d₹40K
  4. 4

    Install or replace undersized community bins at the three overflow points with higher-capacity bins (minimum 1100-litre wheeled containers) to reduce overflow frequency between collection rounds

    PMC Solid Waste Management Department14d₹75K
  5. 5

    Set up a WhatsApp monitoring group with RWA representatives from the affected locations to report overflow incidents in real time and confirm that the twice-daily schedule is being followed; review compliance after 7 days of operation

    Ward Office – Corporator Office21d₹0
How citizens can help

Households segregate at source · shopfronts use new covered bins · RWAs verify collection-day adherence and escalate misses through ward office.

Citizens are partners, not petitioners.
Water✓ Within budget

15 reports this week from Yerwada inner lanes near Bharat Petrol Pump indicate a recurring post-6pm water supply gap averaging severity 3.3/5, with residents resorting to daily tanker calls across 7 identified locations. The corporator can intervene immediately by commissioning a pressure/flow audit and expediting infrastructure fixes to restore reliable piped supply.

74
Priority
₹4.6 L estimate21 days6 steps
What government can do
  1. 1

    Raise a formal written complaint with PMC Hydraulic Department citing the 15 reports and 7 affected locations in Yerwada inner lanes near Bharat Petrol Pump; request an urgent pressure and flow audit of the distribution line serving this area during evening hours (5pm–8pm)

    PMC Hydraulic Department3d₹0
  2. 2

    Arrange for PMC hydraulic engineers to conduct on-site inspection and pressure logging at the Bharat Petrol Pump junction and downstream inner lane supply points during the 5pm–8pm window to identify whether the gap is caused by low end-pressure, valve throttling, illegal connections, or undersized pipes

    PMC Hydraulic Department5d₹25K
  3. 3

    Based on audit findings, direct PMC to repair or replace any faulty pressure-regulating valves, clear blockages, and seal any identified unauthorized connections on the supply line serving the Yerwada inner lanes cluster

    PMC Hydraulic Department7d₹80K
  4. 4

    If pipe undersizing is confirmed, raise a ward fund work order to lay an additional 100mm feeder line from the nearest adequate main to the Bharat Petrol Pump junction to boost evening flow capacity to the 7 affected locations

    PMC Hydraulic Department / Ward Office14d₹3.5 L
  5. 5

    Negotiate with PMC Water Supply Department to temporarily adjust the evening supply schedule or extend supply hours for this zone until permanent repairs are complete, and document tanker deployment reduction as a measurable outcome

    PMC Water Supply Department5d₹0
  6. 6

    Conduct a follow-up field visit at 7pm on day 21 to verify restored supply pressure at the 7 reported locations and collect resident feedback confirming tanker dependency has stopped; report outcomes to PMC ward committee

    Ward Office21d₹5K
How citizens can help

Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.

Citizens are partners, not petitioners.
Traffic✓ Within budget

1 Instagram report documents traffic issues in Ward 7 with maximum severity rating of 5.0/5, indicating a critical congestion or safety concern requiring immediate intervention. The single high-severity report suggests an acute incident rather than chronic pattern, warranting rapid assessment and targeted remediation.

71
Priority
₹1.6 L estimate14 days6 steps
What government can do
  1. 1

    Deploy Junior Engineer to conduct on-ground traffic survey at reported location in Ward 7, documenting signal functionality, road markings, encroachments, and peak-hour vehicle counts within 48 hours

    Traffic Engineering Cell2d₹0
  2. 2

    Re-time traffic signal cycle at affected junction based on survey findings, adjusting green phases to optimize flow for dominant traffic direction

    Traffic Engineering Cell5d₹7K
  3. 3

    Repaint faded road markings including stop lines, lane dividers, and zebra crossings at problem junction covering approximately 50 sqm

    Roads Department7d₹25K
  4. 4

    Station 2 traffic marshals at junction during morning (8-10 AM) and evening (5-7 PM) peak hours for 10 days to enforce lane discipline and manage flow

    Traffic Engineering Cell14d₹90K
  5. 5

    Install 3 reflective traffic signage boards (No Parking, Speed Limit, Lane Discipline) at 100m approaches to junction

    Traffic Engineering Cell10d₹18K
  6. 6

    Clear footpath encroachments within 200m radius of affected area to restore pedestrian pathways and reduce road spillover, executing anti-encroachment drive with ward staff

    Encroachment Department12d₹15K
How citizens can help

Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.

Citizens are partners, not petitioners.