Ward 6 · Pune Municipal Corporation

Kalyani Nagar – Viman Nagar

Corporator: TBD — Contact Sushaasan · Annual budget ₹3.2 Cr

Solution cost vs annual allocation₹1.1 L / ₹3.2 Cr(< 1%)

Resolving every active brief uses < 1% of the ward's annual budget.

👥For Citizens

What's happening in this ward

2 issues reported this week
Traffic1 reports
5/5

Citizen reports from instagram mentioning traffic issues in this ward (last 24h). Severity 5.0/5.

Water1 reports
4/5

1 reports via instagram about water issues in this area (last 24h). Avg severity 4.0/5.

📋For the Corporator's Office
AI-synthesised brief

Ready-to-act solution plan

Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.

Traffic✓ Within budget

One Instagram report identifies a severity 5.0/5 traffic issue in Ward 6 within the last 24 hours, indicating a critical traffic disruption requiring immediate intervention. The high severity suggests potential signal failure, major congestion point, or road blockage affecting commuter safety.

78
Priority
₹1.1 L estimate14 days7 steps
What government can do
  1. 1

    Deploy 2 traffic marshals immediately to the reported congestion point in Ward 6 for manual traffic management from 7AM-11AM and 5PM-9PM peak hours for 3 days while permanent fix is implemented

    Traffic Engineering Cell1d₹30K
  2. 2

    Dispatch junior engineer to conduct on-site inspection of traffic signal functionality, road markings visibility, and junction geometry at the affected location; submit photographic assessment report within 24 hours

    Traffic Engineering Cell2d₹0
  3. 3

    Execute signal re-timing at the identified junction to optimize green-phase cycles based on peak hour traffic volume; recalibrate sensor loops if present

    Traffic Engineering Cell5d₹8K
  4. 4

    Repair/replace any malfunctioning signal heads, LED modules, or controller units identified during inspection at the junction

    Traffic Engineering Cell7d₹45K
  5. 5

    Repaint faded road markings including stop lines, zebra crossings, and lane dividers at the affected junction covering approximately 50 sqm

    Roads Department10d₹15K
  6. 6

    Install 4 reflective signage boards (speed limit, no parking, lane discipline) at 100m approaches to the problem junction

    Traffic Engineering Cell12d₹12K
  7. 7

    Remove any encroachments, illegally parked vehicles, or debris obstructing traffic flow within 200m radius of the identified location through anti-encroachment squad deployment

    Encroachment Department14d₹5K
How citizens can help

Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.

Citizens are partners, not petitioners.