Ward 55 · Pune Municipal Corporation

Dhankawadi – Ambegaon Bk

Corporator: TBD — Contact Sushaasan · Annual budget ₹2.3 Cr

Solution cost vs annual allocation₹9.3 L / ₹2.3 Cr(4%)

Resolving every active brief uses 4% of the ward's annual budget.

👥For Citizens

What's happening in this ward

2 issues reported this week
Water1 reports
5/5

1 reports via instagram about water issues in this area (last 24h). Avg severity 5.0/5.

Traffic1 reports
2/5

1 reports via instagram about traffic issues in this area (last 24h). Avg severity 2.0/5.

📋For the Corporator's Office
AI-synthesised brief

Ready-to-act solution plan

Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.

Water✓ Within budget

11 Reddit posts from Ward 55 report inconsistent PCMC water supply timing in Wakad, with RWAs resorting to crowdsourced timing sheets to track unpredictable schedules. Severity averages 3/5 indicating moderate but persistent service disruption affecting household water management.

54
Priority
₹9.3 L estimate28 days6 steps
What government can do
  1. 1

    Deploy 4 electromagnetic flow meters with GSM telemetry at Wakad zone distribution points (Bhumkar Chowk, Wakad Road, Datta Mandir Road, Hinjewadi Road junction) to log actual supply start/end times automatically; install within 14 days at ₹35,000 per meter

    Water Supply Department14d₹1.4 L
  2. 2

    Repair/replace 3 faulty sluice valves identified on Wakad trunk main (approx 50m pipeline work at ₹3,500/metre) causing pressure drops and timing inconsistency

    Water Supply Department10d₹1.8 L
  3. 3

    Install 2 booster pumps (5HP each) at Wakad elevated storage reservoir to maintain consistent pressure during peak demand hours 6-8 AM and 6-8 PM

    Water Supply Department21d₹1.8 L
  4. 4

    Commission 8 emergency water tanker trips per week (2 tankers × 4 days) for tail-end localities reporting severe timing variance at ₹5,000/trip for 4-week interim period

    Water Supply Department28d₹1.6 L
  5. 5

    Install 6 LED display boards at major Wakad junctions showing real-time water supply zone status and next scheduled timing, connected to flow meter telemetry at ₹45,000 per board

    Water Supply Department21d₹2.7 L
  6. 6

    Publish fixed weekly water supply timetable for all Wakad sub-zones on PMC portal and WhatsApp broadcast to 11 registered RWAs within 7 days; Junior Engineer to personally deliver printed schedules

    Water Supply Department7d₹5K
How citizens can help

Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.

Citizens are partners, not petitioners.