1 report via instagram about electricity issues in this area. Avg severity 5.0/5.
Corporator: TBD — Contact Sushaasan · Annual budget ₹2.1 Cr
Resolving every active brief uses 2% of the ward's annual budget.
1 report via instagram about electricity issues in this area. Avg severity 5.0/5.
Pimple Saudagar Rahatani-side lanes — wet-waste pickup skipped repeatedly during festival week.
2 reports via instagram about traffic issues in this area. Avg severity 3.0/5.
3 reports via instagram about water issues in this area. Avg severity 2.7/5.
Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.
3 Instagram reports identify traffic issues in Ward 53 with average severity 2.67/5, indicating moderate congestion or signal-related problems requiring targeted intervention. The low post volume suggests localized bottlenecks rather than systemic infrastructure failure.
Deploy PMC traffic marshals at 2 identified congestion points in Ward 53 for 7 days to manually regulate flow and identify peak-hour patterns; 2 marshals × 7 days × ₹2,200/marshal/day
Conduct signal re-timing at 2 junctions in the affected area to optimize green-light cycles based on observed traffic patterns; ₹6,500/junction
Install 4 new road signage boards (No Parking, Lane Discipline, Speed Limit) at identified problem spots; ₹3,500/sign including installation
Patch road surface defects causing traffic slowdowns at identified locations; estimated 25 sqm at ₹1,000/sqm
Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.
Residents in Pimple Saudagar Rahatani-side lanes reported wet-waste pickup being skipped repeatedly during festival week, with 9 posts on Reddit highlighting the issue. The disruption appears localized to internal lanes with severity rated at 2.8/5, indicating moderate but persistent service gaps during high-waste-generation period.
Deploy 2 additional wet-waste collection vehicles to Rahatani-side lanes in Pimple Saudagar for 7 days to clear backlog; assign specific route covering lanes mentioned in complaints; vehicle hire at ₹4,500/day × 2 vehicles × 7 days
Install 4 covered 660L wet-waste bins at lane entry points in Rahatani-side area to serve as overflow collection points; bins at ₹18,000 each
Assign 1 SWM supervisor to physically verify daily morning collection (6-9 AM) in affected lanes for 14 days and submit photo-timestamped compliance report; supervisor inspection allowance ₹800/day
Update Ghanta Gadi GPS route to mandatorily include all 6 internal Rahatani-side lanes; submit revised route map to SWM zonal office within 3 days for permanent schedule integration
Spray bio-enzyme odor neutralizer at 8 identified garbage accumulation spots; 20L drums at ₹1,200 each × 3 drums plus labor
Households segregate at source · shopfronts use new covered bins · RWAs verify collection-day adherence and escalate misses through ward office.
1 Instagram report documents electricity issues in Ward 53 with maximum severity rating of 5.0/5, indicating critical power supply disruption requiring immediate intervention. The corporator can initiate emergency coordination with MSEDCL and deploy PMC Street-Light Cell resources for any municipal lighting components.
Lodge formal complaint with MSEDCL Pune division citing Ward 53 electricity failure; obtain complaint reference number and estimated restoration timeline from MSEDCL control room within 24 hours
Deploy PMC electrician team to inspect all municipal streetlight infrastructure in affected locality of Ward 53; document any PMC-side faults in transformer connections or distribution boxes
Replace any damaged LED streetlight units identified during inspection; estimate 5 poles requiring new LED fixtures at ₹4,000 per pole
Repair PMC-owned electrical junction boxes and underground cable faults if identified; allocate emergency electrical repair budget for 50 metres of cable work at ₹600/metre
Install 2 temporary diesel generator sets at critical public locations (community hall, water pump station) if MSEDCL restoration exceeds 48 hours; generator hire at ₹8,000/day for 3 days
Submit written escalation letter to MSEDCL Executive Engineer with corporator's signature demanding priority restoration; attach photographic evidence from Instagram report
RWAs photo-log streetlight outages weekly · residents avoid junction-box tampering · use the MSEDCL fault-number helpline for evidence trail.