Drain blockage on Wanawadi main road: backflow into residential basements after light rain.
Corporator: TBD — Contact Sushaasan · Annual budget ₹2.7 Cr
Resolving every active brief uses 1% of the ward's annual budget.
Drain blockage on Wanawadi main road: backflow into residential basements after light rain.
Streetlights out 6 days on Wanawadi-Salunke Vihar stretch; residents report night-safety concerns.
Wanawadi-Bibwewadi link road peak congestion, school-bus + corporate-shuttle clash 8:45–9:15am.
1 report via instagram about garbage issues in this area. Avg severity 3.0/5.
Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.
The Wanawadi-Bibwewadi link road is experiencing peak congestion between 8:45–9:15am due to simultaneous school-bus and corporate-shuttle traffic, with 13 reports this week averaging a severity of 3.2/5. Immediate traffic management and scheduling coordination are required to separate conflicting vehicle streams during the critical morning window.
Conduct a rapid on-site traffic count and bottleneck mapping on the Wanawadi-Bibwewadi link road between 8:30–9:30am on two consecutive weekdays to document exact pinch points, vehicle mix, and dwell times of school buses and corporate shuttles.
Convene a joint meeting with principals of schools using the link road and HR/admin contacts of corporate offices deploying shuttles on this corridor to negotiate a staggered arrival schedule — schools to complete drop-off by 8:40am and corporate shuttles to begin their run after 9:15am or use an alternate entry point.
Deploy two traffic marshals at the identified bottleneck location on the Wanawadi-Bibwewadi link road every weekday from 8:30–9:30am for a 30-day pilot period to enforce lane discipline, prevent double-parking of buses, and manage pedestrian crossings.
Install at least two 'No Stopping 8:30–9:30am' signboards and one 'School Zone — Slow Down' sign at the identified congestion hotspot, with yellow road-marking for a dedicated school-bus drop-off bay set back from the main carriageway to prevent lane blockage.
Review marshal deployment data and resident feedback after 21 days; if congestion persists, submit a formal proposal to PMC Traffic Engineering Cell for installation of a temporary signal or flashing beacon at the link road junction to provide structured gap acceptance during peak hours.
Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.
14 complaints have been filed this week regarding streetlights being non-functional for 6 days on the Wanawadi-Salunke Vihar stretch, with an average severity of 3.2/5 and resident-reported night-safety concerns. The corporator can resolve this through an immediate fault inspection and coordinated repair order with the PMC Electrical Department within a feasible budget.
Raise a formal written complaint and urgent work order with PMC Electrical Department citing 14 resident reports and 6-day outage duration on the Wanawadi-Salunke Vihar stretch, and request a joint site inspection within 24 hours to identify fault cause (tripped feeder, blown fuses, damaged cables, or faulty fixtures)
Conduct physical inspection of all non-functional streetlight poles on the Wanawadi-Salunke Vihar stretch to document exact number of affected lights, pole IDs, and fault type (ballast failure, wiring fault, MCB trip, or vandalism), and prepare a scope-of-work report for repair
Procure replacement components including LED drivers, fuses, MCBs, and wiring as identified in the inspection report through PMC-empanelled vendors, prioritizing items needed for immediate restoration of the stretch
Deploy PMC electrical maintenance crew to carry out repairs and replacement of faulty components on all identified non-functional streetlights on the Wanawadi-Salunke Vihar stretch, ensuring all lights are tested and operational before crew sign-off
Conduct a post-repair night-time inspection walk along the Wanawadi-Salunke Vihar stretch to verify all streetlights are functioning, collect photographic evidence, communicate restoration to the 14 reporting residents via ward-level communication channels, and log closure in PMC complaint tracking system
RWAs photo-log streetlight outages weekly · residents avoid junction-box tampering · use the MSEDCL fault-number helpline for evidence trail.
15 reports this week identify drain blockage on Wanawadi main road (Ward 43) causing backflow into residential basements even after light rain, with an average severity of 3.3/5. Immediate desilting and structural inspection of the affected drain stretch is needed to prevent property damage and health hazards during the monsoon season.
File a formal written complaint with PMC Storm Water Drain (SWD) Department citing the 15 resident reports and specific location on Wanawadi main road; request emergency desilting work order within 48 hours and obtain a reference number for tracking.
Depute a junior engineer from the ward office to physically inspect and mark the blocked drain stretch on Wanawadi main road, photograph blockage points, measure approximate drain dimensions, and document all basement-entry points to prepare a site report.
Engage a PMC-empanelled desilting contractor to mechanically desilt and clear the identified blocked drain stretch on Wanawadi main road using a suction/jetting machine; remove all debris and silt and dispose as per PMC norms.
Inspect drain covers, grates, and inlet chambers along the affected stretch; replace any broken or missing covers and repair damaged inlet chambers to prevent future blockage and ensure adequate flow capacity.
Conduct a post-work flow test by simulating water flow through the cleared drain; obtain sign-off from the ward engineer confirming blockage removal, and share a resolution update with the 15 reporting residents via ward notice board and local WhatsApp groups.
Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.