Ward 43 · Pune Municipal Corporation

Wanawadi - Kausar Baug

Corporator: TBD — Contact Sushaasan · Annual budget ₹2.7 Cr

Solution cost vs annual allocation₹3.9 L / ₹2.7 Cr(1%)

Resolving every active brief uses 1% of the ward's annual budget.

👥For Citizens

What's happening in this ward

4 issues reported this week
Water15 reports
3/5

Drain blockage on Wanawadi main road: backflow into residential basements after light rain.

Electricity14 reports
3/5

Streetlights out 6 days on Wanawadi-Salunke Vihar stretch; residents report night-safety concerns.

Traffic14 reports
3/5

Wanawadi-Bibwewadi link road peak congestion, school-bus + corporate-shuttle clash 8:45–9:15am.

Garbage2 reports
3/5

1 report via instagram about garbage issues in this area. Avg severity 3.0/5.

📋For the Corporator's Office
AI-synthesised brief

Ready-to-act solution plan

Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.

Traffic✓ Within budget

The Wanawadi-Bibwewadi link road is experiencing peak congestion between 8:45–9:15am due to simultaneous school-bus and corporate-shuttle traffic, with 13 reports this week averaging a severity of 3.2/5. Immediate traffic management and scheduling coordination are required to separate conflicting vehicle streams during the critical morning window.

72
Priority
₹1.5 L estimate21 days5 steps
What government can do
  1. 1

    Conduct a rapid on-site traffic count and bottleneck mapping on the Wanawadi-Bibwewadi link road between 8:30–9:30am on two consecutive weekdays to document exact pinch points, vehicle mix, and dwell times of school buses and corporate shuttles.

    PMC Traffic Engineering Cell3d₹15K
  2. 2

    Convene a joint meeting with principals of schools using the link road and HR/admin contacts of corporate offices deploying shuttles on this corridor to negotiate a staggered arrival schedule — schools to complete drop-off by 8:40am and corporate shuttles to begin their run after 9:15am or use an alternate entry point.

    PMC Ward Office (Corporator-led coordination)5d₹5K
  3. 3

    Deploy two traffic marshals at the identified bottleneck location on the Wanawadi-Bibwewadi link road every weekday from 8:30–9:30am for a 30-day pilot period to enforce lane discipline, prevent double-parking of buses, and manage pedestrian crossings.

    Pune City Traffic Police (PMC liaison via Ward Office)7d₹40K
  4. 4

    Install at least two 'No Stopping 8:30–9:30am' signboards and one 'School Zone — Slow Down' sign at the identified congestion hotspot, with yellow road-marking for a dedicated school-bus drop-off bay set back from the main carriageway to prevent lane blockage.

    PMC Roads & Traffic Engineering Department10d₹55K
  5. 5

    Review marshal deployment data and resident feedback after 21 days; if congestion persists, submit a formal proposal to PMC Traffic Engineering Cell for installation of a temporary signal or flashing beacon at the link road junction to provide structured gap acceptance during peak hours.

    PMC Traffic Engineering Cell21d₹35K
How citizens can help

Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.

Citizens are partners, not petitioners.
Electricity✓ Within budget

14 complaints have been filed this week regarding streetlights being non-functional for 6 days on the Wanawadi-Salunke Vihar stretch, with an average severity of 3.2/5 and resident-reported night-safety concerns. The corporator can resolve this through an immediate fault inspection and coordinated repair order with the PMC Electrical Department within a feasible budget.

74
Priority
₹1.1 L estimate21 days5 steps
What government can do
  1. 1

    Raise a formal written complaint and urgent work order with PMC Electrical Department citing 14 resident reports and 6-day outage duration on the Wanawadi-Salunke Vihar stretch, and request a joint site inspection within 24 hours to identify fault cause (tripped feeder, blown fuses, damaged cables, or faulty fixtures)

    PMC Electrical Department1d₹0
  2. 2

    Conduct physical inspection of all non-functional streetlight poles on the Wanawadi-Salunke Vihar stretch to document exact number of affected lights, pole IDs, and fault type (ballast failure, wiring fault, MCB trip, or vandalism), and prepare a scope-of-work report for repair

    PMC Electrical Department2d₹5K
  3. 3

    Procure replacement components including LED drivers, fuses, MCBs, and wiring as identified in the inspection report through PMC-empanelled vendors, prioritizing items needed for immediate restoration of the stretch

    PMC Stores and Purchase Department5d₹60K
  4. 4

    Deploy PMC electrical maintenance crew to carry out repairs and replacement of faulty components on all identified non-functional streetlights on the Wanawadi-Salunke Vihar stretch, ensuring all lights are tested and operational before crew sign-off

    PMC Electrical Department7d₹40K
  5. 5

    Conduct a post-repair night-time inspection walk along the Wanawadi-Salunke Vihar stretch to verify all streetlights are functioning, collect photographic evidence, communicate restoration to the 14 reporting residents via ward-level communication channels, and log closure in PMC complaint tracking system

    Ward Office and PMC Electrical Department6d₹5K
How citizens can help

RWAs photo-log streetlight outages weekly · residents avoid junction-box tampering · use the MSEDCL fault-number helpline for evidence trail.

Citizens are partners, not petitioners.
Water✓ Within budget

15 reports this week identify drain blockage on Wanawadi main road (Ward 43) causing backflow into residential basements even after light rain, with an average severity of 3.3/5. Immediate desilting and structural inspection of the affected drain stretch is needed to prevent property damage and health hazards during the monsoon season.

74
Priority
₹1.3 L estimate21 days5 steps
What government can do
  1. 1

    File a formal written complaint with PMC Storm Water Drain (SWD) Department citing the 15 resident reports and specific location on Wanawadi main road; request emergency desilting work order within 48 hours and obtain a reference number for tracking.

    PMC Storm Water Drain (SWD) Department2d₹0
  2. 2

    Depute a junior engineer from the ward office to physically inspect and mark the blocked drain stretch on Wanawadi main road, photograph blockage points, measure approximate drain dimensions, and document all basement-entry points to prepare a site report.

    PMC Ward Office – Engineering Cell3d₹5K
  3. 3

    Engage a PMC-empanelled desilting contractor to mechanically desilt and clear the identified blocked drain stretch on Wanawadi main road using a suction/jetting machine; remove all debris and silt and dispose as per PMC norms.

    PMC Storm Water Drain (SWD) Department7d₹80K
  4. 4

    Inspect drain covers, grates, and inlet chambers along the affected stretch; replace any broken or missing covers and repair damaged inlet chambers to prevent future blockage and ensure adequate flow capacity.

    PMC Storm Water Drain (SWD) Department14d₹40K
  5. 5

    Conduct a post-work flow test by simulating water flow through the cleared drain; obtain sign-off from the ward engineer confirming blockage removal, and share a resolution update with the 15 reporting residents via ward notice board and local WhatsApp groups.

    PMC Ward Office – Engineering Cell21d₹5K
How citizens can help

Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.

Citizens are partners, not petitioners.