Pashan-Sus Road tail-end pressure complaints + tanker delivery delays for societies on PMC waiting list.
Corporator: TBD — Contact Sushaasan · Annual budget ₹2.5 Cr
Resolving every active brief uses 6% of the ward's annual budget.
Pashan-Sus Road tail-end pressure complaints + tanker delivery delays for societies on PMC waiting list.
Pashan-Sus electricity intermittency reports — load complaints from residents.
1 reports via instagram about traffic issues in this area (last 24h). Avg severity 2.0/5.
Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.
One Instagram post reports electricity intermittency issues in Pashan-Sus area with load-related complaints from residents. The issue requires coordination with MSEDCL as electricity distribution falls under their jurisdiction, with PMC supporting through streetlight infrastructure assessment.
Submit formal complaint to MSEDCL Pashan subdivision office at Pashan Road documenting reported load fluctuations in Pashan-Sus area, requesting transformer load audit within 72 hours
Audit all PMC streetlight circuits in Pashan-Sus locality (approximately 40 poles) to identify any municipal load contributing to grid stress and disconnect faulty connections
Replace 10 older sodium vapor streetlights with LED units (₹3500 each) in affected Pashan-Sus pocket to reduce PMC load on local transformer
Install 2 voltage stabilizer units at PMC public facility connections (community hall/garden) in Pashan-Sus to prevent backfeed fluctuations at ₹12000 each
Obtain written status report from MSEDCL Pashan subdivision on transformer upgrade timeline and share with ward office for resident communication
RWAs photo-log streetlight outages weekly · residents avoid junction-box tampering · use the MSEDCL fault-number helpline for evidence trail.
Pashan-Sus Road residents report heavy-vehicle bypass traffic clogging the entry point, creating hazardous conditions during school pickup times. Single Instagram post indicates severity level 4, requiring immediate traffic management intervention.
Deploy 2 traffic marshals at Pashan-Sus Road entry point during school hours (7:30-9:00 AM and 1:00-3:30 PM) for 30 days to manually regulate heavy vehicle entry and prioritize school traffic flow
Install 4 'No Heavy Vehicles 7AM-4PM' regulatory signboards (600x900mm) at 500m approach distances on Pashan-Sus Road bypass entry with PMC notification number
Paint road markings including school zone zebra crossings (2 nos), speed breaker warnings, and 'SLOW SCHOOL AHEAD' text at identified hazard location near school entry
Install 2 speed breakers (thermoplastic rumble strips) 100m before school zone entry point to enforce 20kmph speed limit for heavy vehicles
Submit proposal to Pune Traffic Police for time-based heavy vehicle restriction (7AM-4PM) on Pashan-Sus Road entry stretch with draft notification for DCP Traffic approval
Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.
Residents on Pashan-Sus Road tail-end areas report severe water pressure issues and delayed tanker deliveries for societies on PMC waiting list, as documented in 2 social media posts across Instagram and Reddit. The complaints indicate critical water supply failure (severity 5/5) affecting multiple housing societies in Ward 38.
Deploy PMC Water Supply Department field team to Pashan-Sus Road tail-end zones to conduct pressure testing at 6 AM, 12 PM, and 6 PM at 5 identified society entry points using hydraulic pressure gauges; document readings and identify specific pipeline sections with pressure drop below 7 meters head
Repair/replace faulty pressure-reducing valves and leaking joints on Pashan-Sus Road distribution line from main ESR to tail-end (estimated 200 metres of pipeline repair work at ₹3,500/metre including fittings and labor)
Install 2 inline booster pumps (5 HP each) at intermediate points on Pashan-Sus Road network to maintain minimum 10 metres head pressure at tail-end societies; includes electrical connection, pump housing, and commissioning
Dispatch 3 tankers daily (12,000 litres each) for 14 days to societies on PMC waiting list on Pashan-Sus Road at ₹5,500/trip until pipeline pressure restoration is complete; total 42 trips
Update PMC Tanker Management Portal to prioritize Pashan-Sus Road societies currently on waiting list by moving them to priority dispatch queue with guaranteed 24-hour delivery window; assign dedicated tanker route number
Install 2 bulk water storage tanks (10,000 litres capacity each, syntex type) at community common plots identified by societies for buffer storage during low-pressure hours; includes foundation and piping at ₹45,000 per installation
Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.