1 report via instagram about water issues in this area. Avg severity 2.0/5.
Corporator: TBD — Contact Sushaasan · Annual budget ₹2.1 Cr
Resolving every active brief uses < 1% of the ward's annual budget.
1 report via instagram about water issues in this area. Avg severity 2.0/5.
Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.
1 Instagram report identifies water issues in Wanwadi Gaothan-Vaiduwadi ward with severity 2.0/5, indicating a minor but actionable concern. Low post volume suggests localized rather than ward-wide water supply disruption.
Deploy PMC Water Supply field inspector to Wanwadi Gaothan-Vaiduwadi within 48 hours to identify exact location and nature of water issue (low pressure, timing, quality, or leakage) using complaint coordinates from Instagram post
If leak detected: Repair pipeline section (estimated 5 metres) at reported location using standard PMC contractor at ₹3500/metre
If low pressure issue: Install 1 inline booster or clean/replace clogged valve at nearest distribution point serving the reported area
Provide 2 tanker trips as interim relief if repair extends beyond 3 days, at ₹4500/trip standard PMC charter rate
Junior Engineer to verify restored supply at location and log resolution with photo evidence in PMC complaint tracking system
Society facility managers share corrected supply schedules on resident WhatsApp groups · report tanker price gouging via PMC's consumer cell · maintain society storage discipline.