1 reports via instagram about traffic issues in this area (last 24h). Avg severity 4.0/5.
Corporator: TBD — Contact Sushaasan · Annual budget ₹2.5 Cr
Resolving every active brief uses 1% of the ward's annual budget.
1 reports via instagram about traffic issues in this area (last 24h). Avg severity 4.0/5.
Kharadi Phase-3 outages reported across three societies — MSEDCL transformer load issue mentioned.
1 reports via instagram about water issues in this area (last 24h). Avg severity 2.0/5.
Data-backed. Budget-checked. Steps named by department. The corporator's office decides — Sushaasan just does the groundwork.
12 outage reports this week across three societies in Kharadi Phase-3 point to an overloaded MSEDCL transformer as the root cause, with an average severity of 3.3/5. Immediate load assessment and transformer upgrade coordination are required to restore reliable power supply to the affected locations.
File a formal written complaint with MSEDCL Kharadi Sub-Division office citing the 12 reported outages across three societies in Kharadi Phase-3, requesting an urgent transformer load audit within 7 days. Attach resident complaint records as evidence.
Depute a PMC Electrical Department junior engineer to jointly inspect the reported transformer site in Kharadi Phase-3 alongside the MSEDCL team, document current load readings, and confirm whether transformer capacity is being exceeded. Submit inspection report to the corporator.
Based on the inspection report, raise a formal requisition to MSEDCL for transformer load balancing or replacement (upgrade to higher KVA rating). Simultaneously request PMC to allocate contingency funds for any temporary generator or DG set rental to cover the three affected societies during the upgrade period.
Conduct a follow-up ward meeting with representatives of the three affected societies to communicate resolution timeline, share MSEDCL action plan, and collect any additional outage data for escalation to PMC Commissioner if MSEDCL does not act within the committed window.
RWAs photo-log streetlight outages weekly · residents avoid junction-box tampering · use the MSEDCL fault-number helpline for evidence trail.
1 Instagram report identifies traffic issues in Ward 14 with severity 4.0/5, indicating significant congestion or signal malfunction requiring immediate attention. The corporator can deploy targeted traffic engineering interventions to resolve the reported issue.
Deploy 2 traffic marshals to the reported congestion point in Ward 14 for immediate traffic management and on-ground assessment of root cause (signal failure, encroachment, or road defect) for 5 days
Inspect and repair/re-time traffic signal at affected junction in Ward 14 based on marshal feedback - includes signal controller check and cycle optimization
Clear any identified encroachments or illegally parked vehicles obstructing traffic flow within 100m radius of problem location using PMC anti-encroachment squad
Patch any potholes or road surface damage at the junction/approach road causing traffic slowdown - estimated 15 sqm repair area at ₹1000/sqm
Install 2 new road signage boards (No Parking, Lane Discipline) at ₹3500 each to prevent recurring violations at the location
Respect new lane markings once they appear · RWA liaisons coordinate with Traffic Police rapid-response group · share specific evidence, not generalised complaints.